Garage (Detached)



Application Submission

   1. Permit application, including list of contractors (click here)

   2. Plat of survey, marking location & dimensions of garage

   3. Proposal from contractor, if applicable

   4. Two sets of plans/drawings, indicating foundation and framing of structure

   5. Review of VRLB handout detailing required specifications (click here)

Required Inspections

Total of 5-6, depending on project

   1. Footing

   2. Foundation/Slab

   3. Rough Framing

   4. Rough Electric (if applicable)

   5. Pre-Roof

   6. Final